To
configure SFC, go through following steps.
In order to work with SFC first
check license availability from the following location.
Administration
Module :-
Setup>System>Licence Information.
If everything is ok, start with following basic setup
1. Shop Floor Control > Setup > Groups >
Calculation groups
2. Shop Floor Control > Setup > Groups > Approval
groups
3. Shop Floor Control > Setup > Indirect activities
4. Shop Floor Control > Setup > Payroll > Pay
types
5. Shop Floor Control > Setup > Payroll > Pay
periods
6. Shop Floor Control > Setup > Groups > Absence
groups
7. Shop Floor Control > Setup > Production >
Production parameters
8. Shop Floor Control > Setup > Profile > Profile
9. Shop Floor Control > Setup > Profile > Profile
group
10. Shop Floor Control > Setup > Payroll > Pay
agreements
11. Human Resources > Places > Employees
12. Shop Floor Control > Setup > Employee
After basic setup it’s time to decide Scheduling Method suitable to
you.
To decide which Scheduling you are
going to use and select level of production order planning at:
Shop Floor Control > Setup >
Production > Production Parameters
A.
Select Route if you use MRP II (Material Resource
Planning) and want to plan production orders only on dates. At this level, production
orders consist of operations.
B.
Select Job if you use MRP III and want to be able to
plan production orders on a more detailed level using date and time. At this
level, production orders consist of operations and jobs connected to each
operation.
If the company uses job scheduling
when planning production jobs, as described in step B use the same number
sequence as is used for job identification in the Production module.
Click Production > Setup >
Parameters.
On the Number Sequences tab, if you
are using JOB Scheduling set this sequence number at
SFC > Setup > Parameters. On
Number Sequence tab.
Now to make everything work we need
to setup “Parameters” this is crucial step from practical point of view!
First take look at Shop floor
control parameters.
For default setup in this parameter
form only NumberSequence is needs to be setup.
To see screenshot of Parameters at
Production clickhere.
Secondly go through Parameter setup
at Production module.
Start tab:
Update Start On-Line = "Status + qty" or
"Status". Must tick "Use shop floor control
parameters"
Operation tab:
As specified in 1,
select job level. Tick Setup & process check box
Report as finish:
Update Start On-Line = "Status + qty" or
"Status". Must tick "Use shop floor control
parameters"
To see screenshot of Production
parameters at Shop floor control clickhere.
NOTE: Specify proper journal name for PickingList, Route and
Report as finish in all tab.
Any wrong journal name will lead to
no job list at Registration form.